What happens when: your renovation, start to finish

A renovation is a run of jobs that have to happen in the right order. Here’s each step, what you’ll need to do, and when you can and can’t use the room.

  • Steps 1 to 4: planning, and the room still works
  • Steps 5 to 9: the room is out of action
  • Step 10: it’s yours again

Show the steps for a bathroom or a kitchen

  1. Planning

    You get in touch

    Call 0488 003 090 or send the short enquiry form. Say which room, roughly what you’d like, and your suburb.

    Your partA few phone photos of the room help a lot.

    Room in use

  2. Planning

    A look at the room

    Shane measures up, checks what he can of what’s behind the walls and under the floor, and talks through what you want from the room.

    Your partHave a rough budget in mind, and any pictures of rooms you like.

    Room in use

  3. Planning

    Your written quote

    What’s included, what isn’t, which trades are involved and roughly how long it will take. Nothing is booked until you’re happy with it.

    Your partRead it through and ask about anything that isn’t clear.

    Room in use

  4. Planning

    Choosing the finishes

    Tiles, vanity, tapware, shower screen, mirror and lighting. Anything with a long wait gets ordered early, so it’s on site before it’s needed.

    Cabinet colours, benchtop, splashback, handles, sink and tap. Cabinets and stone take the longest to make, so they’re ordered first.

    Your partMake your choices by the agreed date, so the job starts on time.

    Room in use

  5. The work

    Strip-out

    The old bathroom comes out, back to the frame. The way through the house is protected and the rubbish is taken away.

    The old kitchen comes out. Floors and nearby rooms are protected and the rubbish is taken away.

    Your partClear the room, and plan for another bathroom while this one’s out.Clear the cupboards, and set up a kettle, microwave and fridge in another room.

    Room out of action

  6. The work

    Carpentry and rough-in

    Framing is repaired or changed, and timber goes in where the vanity, cabinets and fittings will hang. Licensed plumbers and electricians run new pipes and wiring while the walls are open, then the new wall sheeting goes up.

    Your partNothing, unless something unexpected turns up behind the walls.

    Room out of action

  7. The work

    Waterproofing

    Cabinets in

    Every wet area is waterproofed to the Australian Standard and left to cure before a single tile goes on. It’s the step you never see, and the one that matters most.

    The cabinets go in, levelled and fixed. Then the benchtops are measured from the real cabinets, not the plans, and made to fit. This is usually the longest wait in a kitchen job.

    Your partNothing. This step needs patience, not you.

    Room out of action

  8. The work

    Tiling

    Benchtops and splashback

    Floor first, then walls. Then grout, and the room starts to look like the picture in your head.

    The benchtops are fitted, then the splashback is tiled or installed behind them.

    Your partNothing, but it’s a good time to have a look.

    Room out of action

  9. The work

    Fit-off

    The vanity, toilet, tapware, shower screen, mirror and accessories go in. The plumber and electrician connect everything, and the last of the silicone goes on.

    The sink, tap, cooktop, oven and rangehood are connected by the licensed trades, the handles go on and the doors are adjusted.

    Your partHave any of your own fittings or appliances on site.

    Room out of action

  10. Done

    Clean and handover

    The room is cleaned, and you walk through it together: how everything works, and how to look after the new surfaces.

    Your partEnjoy it. And if you’re happy, a Google review helps other locals find Shane.

    Back in use

Questions

Renovation questions people ask

How long does a bathroom renovation take?

It depends on the size of the room, what’s found behind the walls, how long the finishes take to arrive, and the time waterproofing needs to cure. You’ll get a timeline with your written quote.

Can we stay at home while the work is done?

Most people do. If it’s your only bathroom, you’ll need a plan for the days it’s out of action. For a kitchen, a kettle, microwave and fridge in another room go a long way. Talk it through when Shane comes to look at the room.

Who does the plumbing and electrical work?

In Queensland, plumbing and electrical work must be done by licensed plumbers and electricians. They come in at the rough-in, while the walls are open, and again at the fit-off.

What if something unexpected turns up behind the walls?

Old bathrooms and kitchens can hide water damage or tired framing. In Queensland, changes to a building contract, called variations, should be agreed in writing before the extra work is done, so you always know the cost first.

Do I need to choose everything before work starts?

It helps. Choosing tiles, tapware and benchtops early means they can be ordered in time, and the job doesn’t stop while you wait for something to arrive.