What happens when: your renovation, start to finish
A renovation is a run of jobs that have to happen in the right order. Here’s each step, what you’ll need to do, and when you can and can’t use the room.
- Steps 1 to 4: planning, and the room still works
- Steps 5 to 9: the room is out of action
- Step 10: it’s yours again
Show the steps for a bathroom or a kitchen
-
Planning
You get in touch
Call 0488 003 090 or send the short enquiry form. Say which room, roughly what you’d like, and your suburb.
-
Planning
A look at the room
Shane measures up, checks what he can of what’s behind the walls and under the floor, and talks through what you want from the room.
-
Planning
Your written quote
What’s included, what isn’t, which trades are involved and roughly how long it will take. Nothing is booked until you’re happy with it.
-
Planning
Choosing the finishes
Tiles, vanity, tapware, shower screen, mirror and lighting. Anything with a long wait gets ordered early, so it’s on site before it’s needed.
Cabinet colours, benchtop, splashback, handles, sink and tap. Cabinets and stone take the longest to make, so they’re ordered first.
-
The work
Strip-out
The old bathroom comes out, back to the frame. The way through the house is protected and the rubbish is taken away.
The old kitchen comes out. Floors and nearby rooms are protected and the rubbish is taken away.
-
The work
Carpentry and rough-in
Framing is repaired or changed, and timber goes in where the vanity, cabinets and fittings will hang. Licensed plumbers and electricians run new pipes and wiring while the walls are open, then the new wall sheeting goes up.
-
The work
Waterproofing
Cabinets in
Every wet area is waterproofed to the Australian Standard and left to cure before a single tile goes on. It’s the step you never see, and the one that matters most.
The cabinets go in, levelled and fixed. Then the benchtops are measured from the real cabinets, not the plans, and made to fit. This is usually the longest wait in a kitchen job.
-
The work
Tiling
Benchtops and splashback
Floor first, then walls. Then grout, and the room starts to look like the picture in your head.
The benchtops are fitted, then the splashback is tiled or installed behind them.
-
The work
Fit-off
The vanity, toilet, tapware, shower screen, mirror and accessories go in. The plumber and electrician connect everything, and the last of the silicone goes on.
The sink, tap, cooktop, oven and rangehood are connected by the licensed trades, the handles go on and the doors are adjusted.
-
Done
Clean and handover
The room is cleaned, and you walk through it together: how everything works, and how to look after the new surfaces.
Questions
Renovation questions people ask
How long does a bathroom renovation take?
It depends on the size of the room, what’s found behind the walls, how long the finishes take to arrive, and the time waterproofing needs to cure. You’ll get a timeline with your written quote.
Can we stay at home while the work is done?
Most people do. If it’s your only bathroom, you’ll need a plan for the days it’s out of action. For a kitchen, a kettle, microwave and fridge in another room go a long way. Talk it through when Shane comes to look at the room.
Who does the plumbing and electrical work?
In Queensland, plumbing and electrical work must be done by licensed plumbers and electricians. They come in at the rough-in, while the walls are open, and again at the fit-off.
What if something unexpected turns up behind the walls?
Old bathrooms and kitchens can hide water damage or tired framing. In Queensland, changes to a building contract, called variations, should be agreed in writing before the extra work is done, so you always know the cost first.
Do I need to choose everything before work starts?
It helps. Choosing tiles, tapware and benchtops early means they can be ordered in time, and the job doesn’t stop while you wait for something to arrive.